Wayzata New-Home Prices
| Figure | Value | Source |
|---|---|---|
| New-construction sales in Wayzata | 1 | Minnesota eCRV deed records, 12 months: too few for a range |
| Hennepin County, middle half of 633 sales | $425,000 to $734,000 | Minnesota eCRV deed records, 12 months |
| Hennepin County median sale price | $575,000 | Minnesota eCRV deed records, 12 months |
| Price per finished sq ft | Not published | Hennepin County publishes no finished square footage (regional parcel attribute guide, §4.39) |
| Building permit, $500,001 to $1,000,000 valuation | $3,707.25 + $5.50 per $1,000 over $500,000 | Wayzata's 2026 fee schedule (wayzata.org) |
Sale prices include the lot. The deed records are the Minnesota Department of Revenue’s weekly eCRV extracts; finished square footage is each county assessor’s, as the Metropolitan Council’s regional parcel dataset publishes it.
What Wayzata Charges: Permit, Plan Review and Water Access
The 3 charges below are transcribed from the documents Wayzata publishes, each with the date printed on it.
Transcribed from Wayzata’s own published fee schedule. Figures are reproduced as printed — including the source’s own typography — and no fee is calculated here: permit fees are valuation-bracket tables, and the valuation is the city’s to set. Take these to the city and confirm before you budget from them.
Building permit fee
2026 BUILDING PERMIT FEE SCHEDULE - TOTAL VALUATION / FEES: "$1.00 to $500.00 = $47.25"; "$501 to $2,000.00 = $47.25 for the first $500.00 plus $3.58 for each additional $100.00 or fraction thereof, to and including $2000.00"; "$2,001.00 to $25,000.00 = $80.00 for the first $2,000.00 plus $16.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00"; "$25,001.00 to $50,000.00 = $450.00 for the first $25,000.00 plus $11.75 for each additional $1,000.00 or fraction thereof, to and including $50,000.00"; "$50,001.00 to $100,000.00 = $738.25 for the first $50,000.00 plus $8.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00"; "$100,001.00 to $500,000.00 = $1,139.50 for the first $100,000.00 plus $6.50 for each additional $1,000.00 or fraction thereof, to and including $500,000.00"; "$500,001.00 to $1,000,000.00 = $3,707.25 for the first $500,000.00 plus $5.50 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00"; "$1,000,001.00 and up = $6,430.00 for the first $1,000,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof". State surcharge: "State surcharge = .0005 of valuation (50 cent minimum fee)". Valuation note: "Building permit fees are based on value of the improvement when the project is completed. Our fee tables are based on the total cost of all construction activity for the project including material and labor; and should reflect electrical, gas, mechanical and plumbing costs. Labor estimates must be included even if you are doing the work yourself."
Source document · Date printed on the source: 2026 (document titled "2026 BUILDING PERMIT FEE SCHEDULE" / "2026 Approved Fee Schedule"; no separate adoption date printed) · Retrieved 2026-08-06
Plan review fee
"Plan review = 65% of permit fee"; "Plan review of residential interior remodel = 35% of permit fee"; "Plan review of similar plans = 25% of permit fee"
Source document · Date printed on the source: 2026 ("2026 Approved Fee Schedule") · Retrieved 2026-08-06
Water access charge — Wayzata calls it the “City WAC fee”
Levied: per connection / per single-family dwelling unit (schedule states a flat amount; no per-unit qualifier printed)
"City WAC fee $2,995.00" (listed under "Additional fees when applicable:" alongside "City SAC fee $1,000" and "MCES SAC fee $2,485.00")
Source document · Date printed on the source: 2026 ("2026 Approved Fee Schedule") · Retrieved 2026-08-06
Research notes for Wayzata (1)
- Document reached from the city's Permits & Licensing page, https://www.wayzata.org/172/Permits-Licensing. The PDF itself carries no city name in its text - attribution rests on it being hosted in wayzata.org's DocumentCenter and linked as the city's "2026 Approved Fee Schedule". SAC amounts recorded here only to show the WAC line's context; per instructions only the WAC value is captured as the wac field.
Frequently Asked Questions
What do new homes sell for in Wayzata?
Our eCRV deed records hold 1 new-construction sale in Wayzata in the latest 12 months, too few for a price range; across Hennepin County the middle half of 633 sold for $425,000 to $734,000, lot included, median $575,000.
What does a new home cost per square foot in Wayzata?
Hennepin County publishes no finished square footage in the regional parcel data (its attribute guide, §4.39), so no price per square foot is given.
What does Wayzata charge for a building permit?
Wayzata's 2026 fee schedule prices the building permit on the project's valuation: $3,707.25 for the first $500,000 plus $5.50 for each additional $1,000, up to $1,000,000.
Who builds in Wayzata?
68 home builders serve Wayzata on our roster, and 64 hold an active Minnesota residential building contractor license (Minnesota Statutes §326B.805).
Builders Serving Wayzata
The 68 builders in our Wayzata directory can price your lot and plan, or get matched free and we'll shortlist the best fits.