Cost to Build a House in Woodbury (2026)

Sales through November 9, 2026 · Part of our Minnesota cost-to-build guide

In the latest 12 months of Minnesota eCRV deed records, the middle half of 166 new-construction sales in Woodbury sold for $366,000 to $689,000, lot included, with a median of $575,000; the 166 are on lots our Lot Finder tracks, so the count is a floor.

109 of Woodbury's 166 sales carry the county assessor's finished square footage in the Metropolitan Council's regional parcel data: the middle half sold for $194 to $228 per finished square foot, lot included (median $212), where Washington County counts finished square footage from its assessment records.

Woodbury's 2026 fee schedule prices the building permit on the project's valuation: $3,915.30 for the first $500,000 plus $5.60 for each additional $1,000, up to $1,000,000.

A two-storey house framed and house-wrapped, its roof sheathed and its windows in

Woodbury New-Home Prices and Price per Square Foot

FigureValueSource
New-construction sales in Woodbury 166 Minnesota eCRV deed records, 12 months (a floor: lots our Lot Finder tracks)
Middle half of sale prices, lot included $366,000 to $689,000 Minnesota eCRV deed records, 12 months
Median sale price $575,000 Minnesota eCRV deed records, 12 months
Woodbury, price per finished sq ft, middle half $194 to $228 County assessor's finished square footage, Metropolitan Council regional parcels (109 of 166 sales)
Woodbury, median price per finished sq ft $212 County assessor's finished square footage, Metropolitan Council regional parcels (109 of 166 sales)
Building permit, $500,001 to $1,000,000 valuation $3,915.30 + $5.60 per $1,000 over $500,000 Woodbury's 2026 fee schedule (woodburymn.gov)

Sale prices include the lot. The deed records are the Minnesota Department of Revenue’s weekly eCRV extracts; finished square footage is each county assessor’s, as the Metropolitan Council’s regional parcel dataset publishes it.

What Woodbury Charges: Permit, Plan Review and Water Access

A new two-storey house fully framed and sheathed in autumn

The 3 charges below are transcribed from the documents Woodbury publishes, each with the date printed on it.

Transcribed from Woodbury’s own published fee schedule. Figures are reproduced as printed — including the source’s own typography — and no fee is calculated here: permit fees are valuation-bracket tables, and the valuation is the city’s to set. Take these to the city and confirm before you budget from them.

Building permit fee

Building permit fee schedule (Sec. 6-19(b)), preceded by: "Value based permit fees apply to new construction, additions and alterations, including basement finishing, decks, siding, roofs, etc. and demolitions. The fees are based on total valuation." Rows: "$1.00 to $500.00 = $30.00"; "$501.00 to $2,000.00 = $30.00 for the first $500.00 plus $3.65 for each additional $100.00, or fraction thereof, to and including $2,000.00"; "$2,001.00 to $25,000.00 = $84.75 for the first $2,000.00 + $16.60 for each additional $1,000.00, or fraction thereof, to and including $25,000.00"; "$25,001.00 to $50,000.00 = $466.55 for the first $25,000.00 + $12.15 for each additional $1,000.00, or fraction thereof, to and including $50,000.00"; "$50,001.00 to $100,000.00 = $770.30 for the first $50,000.00 + $8.50 for each additional $1,000.00, or fraction thereof, to and including $100,000.00"; "$100,001.00 to $500,000.00 = $1,195.30 for the first $100,000.00 + $6.80 for each additional $1,000.00, or fraction thereof, to and including $500,000.00"; "$500,001.00 to $1,000,000.00 = $3,915.30 for the first $500,000.00 + $5.60 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00"; "$1,000,001.00 and up = $6,715.30 for the first $1,000,000.00 + $4.55 for each additional $1,000.00, or fraction thereof".

Source document · Date printed on the source: 2026 (document titled "2026 Fee Schedule - Final Version"; column header "2026 Fee") · Retrieved 2026-08-06

Plan review fee

Plan review fee: "Standard = 65% of building permit fee"; "Plan review for similar plans (6-19, MN Rules 1300.0160, subp. 5) = 25% of normal building permit fee"; "Planning and zoning review and verification = $100.00"; "Licensed facilities plan review and verification = $100.00"

Source document · Date printed on the source: 2026 ("2026 Fee Schedule - Final Version") · Retrieved 2026-08-06

Water access charge — Woodbury calls it the “Water Area Charge”

Levied: per dwelling unit (detached SFH density band: one to four dwelling units/acre)

Under heading "Water Area Charge": "One to four dwelling units/acre; connection charge per dwelling unit = $2,745.00". Same section also lists "Residential water supply, storage and oversizing area charge per acre = $20,580.00", "Water trunk used as lateral area charge per front foot = $66.00", "Water laterals = Actual cost incurred by the city", "Over four to eight dwelling units/acre; connection charge per dwelling unit = $2,195.00", "Over eight dwelling units/acre; connection charge per dwelling unit = $1,645.00".

Source document · Date printed on the source: 2026 ("2026 Fee Schedule - Final Version") · Retrieved 2026-08-06

Research notes for Woodbury (1)
  • Woodbury does not use the label "WAC"; its equivalent is the "Water Area Charge" section, which combines a per-acre trunk/oversizing area charge ($20,580.00/acre residential) with a per-dwelling-unit connection charge ($2,745.00 at 1-4 units/acre). Both captured above; the per-unit figure is the one recorded as the WAC value. State surcharge is NOT stated anywhere in Woodbury's 2026 fee schedule (verified across all 22 pages) - left unrecorded rather than assumed. Excluded per instructions: MCES/sanitary sewer trunk and lateral charges, storm sewer area charges, and park dedication ("Single family, multi-family and mobile home subdivisions per unit, Sec. 21-117 = $4,000.00"). Document reached from https://www.woodburymn.gov/1346/Building-Permits-Inspections.

Frequently Asked Questions

What do new homes sell for in Woodbury?

In the latest 12 months of Minnesota eCRV deed records, the middle half of 166 new-construction sales in Woodbury sold for $366,000 to $689,000, lot included, with a median of $575,000; the 166 are on lots our Lot Finder tracks, so the count is a floor.

What does a new home cost per square foot in Woodbury?

109 of Woodbury's 166 sales carry the county assessor's finished square footage in the Metropolitan Council's regional parcel data: the middle half sold for $194 to $228 per finished square foot, lot included (median $212), where Washington County counts finished square footage from its assessment records.

What does Woodbury charge for a building permit?

Woodbury's 2026 fee schedule prices the building permit on the project's valuation: $3,915.30 for the first $500,000 plus $5.60 for each additional $1,000, up to $1,000,000.

Who builds in Woodbury?

53 home builders serve Woodbury on our roster, and 50 hold an active Minnesota residential building contractor license (Minnesota Statutes §326B.805).

Builders Serving Woodbury

The 53 builders in our Woodbury directory can price your lot and plan, or get matched free and we'll shortlist the best fits.

Cost Guides for Nearby Cities