Cost to Build a House in Edina (2026)

Sales through November 9, 2026 · Part of our Minnesota cost-to-build guide

Our eCRV deed records hold 1 new-construction sale in Edina in the latest 12 months, too few for a price range; across Hennepin County the middle half of 633 sold for $425,000 to $734,000, lot included, median $575,000.

Hennepin County publishes no finished square footage in the regional parcel data (its attribute guide, §4.39), so no price per square foot is given.

Edina's fee schedule prices the building permit on the project's valuation: $4,096 for the first $500,000 plus $6.10 for each additional $1,000, up to $1,000,000.

A white board-and-batten modern farmhouse with black windows and a metal porch roof on a wooded lot at evening

Edina New-Home Prices

FigureValueSource
New-construction sales in Edina 1 Minnesota eCRV deed records, 12 months: too few for a range
Hennepin County, middle half of 633 sales $425,000 to $734,000 Minnesota eCRV deed records, 12 months
Hennepin County median sale price $575,000 Minnesota eCRV deed records, 12 months
Price per finished sq ft Not published Hennepin County publishes no finished square footage (regional parcel attribute guide, §4.39)
Building permit, $500,001 to $1,000,000 valuation $4,096 + $6.10 per $1,000 over $500,000 Edina's fee schedule (library.municode.com)

Sale prices include the lot. The deed records are the Minnesota Department of Revenue’s weekly eCRV extracts; finished square footage is each county assessor’s, as the Metropolitan Council’s regional parcel dataset publishes it.

What Edina Charges: Permit, Plan Review and Water Access

A new two-storey house fully framed and sheathed in autumn

The 3 charges below are transcribed from the documents Edina publishes, each with the date printed on it.

Transcribed from Edina’s own published fee schedule. Figures are reproduced as printed — including the source’s own typography — and no fee is calculated here: permit fees are valuation-bracket tables, and the valuation is the city’s to set. Take these to the city and confirm before you budget from them.

Building permit fee

Sec. 2-724, Schedule A -- Chapter 10, Sec. 10-74 "Building Permit"
"If total valuation of work is:" / "Then amount is:"
$1.00 to $500.00 -- $34.85
$501.00 to $2,000.00 -- $34.85 *For first $500.00, plus $3.90 for each additional $100.00 or fraction thereof to and including $2,000.00
$2,001.00 to $25,000.00 -- $93.35 *For first $2,000.00, plus $18.05 for each additional $1,000.00 or fraction thereof to and including $25,000.00
$25,001.00 to $50,000.00 -- $508.50 *For first $25,000.00, plus $12.80 for each additional $1,000.00 or fraction thereof to and including $50,000.00
$50,001.00 to $100,000.00 -- $828.50 *For first $50,000.00, plus $9.35 for each additional $1,000.00 or fraction thereof to and including $100,000.00
$100,001.00 to $500,000.00 -- $1,296.00 *For first $100,000.00, plus $7.00 for each additional $1,000.00 or fraction thereof to and including $500,000.00
$500,001.00 to $1,000,000.00 -- $4,096.00 *For the first $500,000.00, plus $6.10 for each additional $1,000.00 or fraction thereof to and including $1,000,000.00
$1,000,001.00 and up -- $7,146.00 *For the first $1,000,000.00, plus $4.70 for each additional $1,000.00 or fraction thereof
Also in the same block: "New single-family dwellings valued at $350,000.00 or less | $0.00 | Wave building permit and plan review fee for affordable single-family home"; "Pre pay electronic application fee | 0.50% | Application fee .50% of the value of the project"

Source document · Date printed on the source: Edina City Code Sec. 2-724 Schedule A; codified through Ord. No. 2025-19, enacted 12-16-2025 (Supp. No. 15, Update 3); Schedule A history note ends 'Ord. No. 2025-16, Sec. 1, 12-16-2025' · Retrieved 2026-08-06

Plan review fee

Row directly under the building permit table in Schedule A: "Plan review | 65% of permit fee".

Source document · Date printed on the source: Edina City Code Sec. 2-724 Schedule A; codified through Ord. No. 2025-19, enacted 12-16-2025 (Supp. No. 15, Update 3); Schedule A history note ends 'Ord. No. 2025-16, Sec. 1, 12-16-2025' · Retrieved 2026-08-06

Water access charge — Edina calls it the “Water connection charge per REC unit”

Levied: per REC unit, multiplied by number of SAC units (single-family home = 1 SAC unit)

Schedule A, Chapter 28, Sec. 28-143 "Charge for connection to city water or sewer system": "$3,331.72 | Water connection charge per REC unit x number of SAC units"; "$2,665.38 | Water connection charge per REC unit x number of SAC units with 20% reduction with city approval"; "$2,498.79 | Water connection charge per REC unit x number of SAC units with 25% reduction with city approval".

Source document · Date printed on the source: Edina City Code Sec. 2-724 Schedule A; codified through Ord. No. 2025-19, enacted 12-16-2025 (Supp. No. 15, Update 3); Schedule A history note ends 'Ord. No. 2025-16, Sec. 1, 12-16-2025' · Retrieved 2026-08-06

Research notes for Edina (1)
  • Edina does not publish a standalone annual fee-schedule PDF; its fee schedule is codified as City Code Sec. 2-724, Schedule A, amended each December (Ord. 2025-16, 12-16-2025). State surcharge is NOT given as a number: Code Sec. 10-74 and 10-78 say the surcharge is "in accordance with / in the amount set forth in Minn. Stats. Sec. 326B.148" (statutory, no local figure). A separate $5.00 local surcharge exists only for residential contractor license verification (Sec. 10-79, per Minn. Stats. Sec. 326.86). CAVEAT: Edina adopted Ordinance 2026-06 in 2026 amending Chapter 2/Schedule A for residential water USAGE tiers (city Utility Rates page effective 5/1/2026 shows tiers not yet in the codified Schedule A). No evidence it touched the Sec. 28-143 connection charge or the Sec. 10-74 permit table, but the text of Ord. 2026-06 (https://www.edinamn.gov/DocumentCenter/View/18933) could not be parsed, so a small residual risk remains that the WAC changed mid-2026. Excluded per instructions: Met Council SAC (Sec. 28-112), park dedication, and the sewer connection charge ($3,235.20/REC). library.municode.com returns 403 to plain fetchers; content was retrieved via Municode's own API / a real browser session.

Frequently Asked Questions

What do new homes sell for in Edina?

Our eCRV deed records hold 1 new-construction sale in Edina in the latest 12 months, too few for a price range; across Hennepin County the middle half of 633 sold for $425,000 to $734,000, lot included, median $575,000.

What does a new home cost per square foot in Edina?

Hennepin County publishes no finished square footage in the regional parcel data (its attribute guide, §4.39), so no price per square foot is given.

What does Edina charge for a building permit?

Edina's fee schedule prices the building permit on the project's valuation: $4,096 for the first $500,000 plus $6.10 for each additional $1,000, up to $1,000,000.

Who builds in Edina?

97 home builders serve Edina on our roster, and 93 hold an active Minnesota residential building contractor license (Minnesota Statutes §326B.805).

Builders Serving Edina

The 97 builders in our Edina directory can price your lot and plan, or get matched free and we'll shortlist the best fits.

Cost Guides for Nearby Cities