Builder view: Front-street assignment unresolved among two plausible frontages; setbacks applied per edge under each give the same envelope: ≈ 3,659 sq ft (front 25 ft, side 7.5 ft (15 ft combined total), rear 30 ft, corner side 15 ft); bound by the coverage cap; preliminary planar computation — not an approval or survey. The binding limit here is the 40% total impervious surface cap (§36-787): ≈ 3,659 sq ft - smaller than the 4,044 sq ft the setbacks alone would allow. That allowance covers house, garage, driveway, patio and walks together, so the house itself will be meaningfully smaller once a driveway is included. Based on Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07); confirm your parcel's zoning.
- Preliminary — not an approval or survey.
- Which street this lot fronts is not resolved, but both plausible frontage assignments were evaluated and every one gives the same buildable area — the unresolved front does not change this figure.
- Cap-bound figure — a structural upper bound, not an understatement.
- Confidence is limited by: the zoning district is assumed (the city’s typical single-family district), not verified for this parcel.
- A second street frontage here does not meet the first at a corner, so the ordinance’s corner-side setback does not apply to it and the loaded rules name no other; it takes the largest applicable setback — the range under-approximates at that end.
- This district also caps the two side yards at a combined 15 ft total, with at least 5 ft on any one side (§36-295(3)b.1). That combined total IS applied here — 7.5 ft per side — and any other lawful split of the same total gives the same buildable area.
55% confidence · rule tier: local (city/township) ordinance data · source: Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07) — read on a third-party mirror, not the publisher's own platform · as of 8/1/2026