All site signals below are preliminary site signals — not a determination. Verify before you rely on them.
Data confidence
A plain-language status — not a score. This page documents 5 facts from public records (one of them the 4 building rules cited to Maple Grove City Code §36-295), estimates 2 more from models, relies on 3 unverified screening defaults, and lists 8 things to verify before you rely on it.
- What we know
- 5 documented signals (building rules (cited), parcel boundary, jurisdiction, mapped zoning and 1 more) — each carries its source and as-of date below.
- What we estimate
- 2 modeled values (preliminary setback envelope (per-edge range — front street unresolved between two plausible frontages), sewer proximity (estimated)) — modeled, not measured; treat as screening only.
- What needs verification
- 8 items only a professional or the city can confirm — the full checklist is below.
- Rules basis
- Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07) + regional screening defaults for rules not yet loaded — This parcel is mapped as zoning district R-A in the city’s published GIS layer. The values shown are the city’s typical single-family district standards, applied to this parcel regardless of its mapped district — confirm the standards for your district with the city. Some rules shown use a regional screening default — the Maple Grove ordinance is not yet loaded for them; verify locally before relying on any number.
Plain-English summary
This parcel in Maple Grove sits in the Osseo Public School District school district. Part of the parcel is mapped in a FEMA Special Flood Hazard Area, so flood insurance and elevation requirements likely apply. No wetlands are mapped on the parcel in screening data, though small basins can go unmapped and a delineation is still recommended before construction. On utilities, water service is undocumented and sewer service is inside the regional service area — a connection is not confirmed until the city or utility confirms it, so budget time to verify location and fees. Tree cover is substantial — most of the lot sits under canopy in the 2015 modeled estimate, so plan for clearing and tree-preservation choices. We do not yet have data on terrain, water service, and shoreland status — on this page, unknown never means "no concern."
Rules applied: Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07) + regional screening defaults for rules not yet loaded This parcel is mapped as zoning district R-A in the city’s published GIS layer. The values shown are the city’s typical single-family district standards, applied to this parcel regardless of its mapped district — confirm the standards for your district with the city. Some rules shown use a regional screening default — the Maple Grove ordinance is not yet loaded for them; verify locally before relying on any number.
What we know, what we estimate, what you must verify
What we know
Recorded, authoritative facts.
- Building rules (cited)4 rule sets cited to Maple Grove City Code §36-295
Source: Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07) · as of 8/1/2026 · 90% confidence
- Parcel boundaryRecorded county GIS parcel on file (not a survey)
Source: County GIS
- JurisdictionMaple Grove, Hennepin County
Source: County GIS
- Mapped zoningR-A
Source: Maple Grove Neighborhood Parcels — ZONING (city AGOL) · as of 8/12/2026
- Market statusPotential build site — identified from county GIS
Source: MetroGIS Regional Parcel Dataset (MN Geospatial Commons) · as of 7/21/2026
What we estimate
Modeled or preliminary — useful for screening, not decisions.
- Preliminary setback envelope (per-edge range — front street unresolved between two plausible frontages)Which street this lot fronts is not yet resolved, so the buildable envelope is a range: roughly 4,773–5,401 sq ft depending on which street frontage governs — preliminary, not an approval or survey. Based on Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07); confirm your parcel's zoning.
Source: Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07) — read on a third-party mirror, not the publisher's own platform · as of 8/1/2026 · 55% confidence
- Sewer proximity (estimated)Public utilities may be available nearby; connection location & fees require confirmation
55% confidence
What you must verify
Professional and municipal confirmations before you build.
- Boundary survey (a recorded GIS boundary is not a survey)
- Wetland delineation by a certified delineator
- Soil borings & septic feasibility (if no municipal sewer)
- Utility connection points, capacity and SAC/WAC fees with the city or utility
- Permit eligibility and any overlay/PUD conditions with the jurisdiction
- Easements, covenants and title work
- Final setbacks and buildable area per the current local ordinance
- Actual construction cost from builder quotes
What each signal means
Written for homeowners; open “the details” on any card for the builder view and the raw measurement behind it.
Slope & terrain: not yet evaluated — unknown is not the same as no concern. no slope statistics
The details
Builder view: Slope & terrain: no qualifying evidence in the current dataset (no slope statistics); treat as unresolved, not as clear.
No underlying measurement on file for this signal.
- Unknown ≠ clear: absence of data is never treated as "no concern".
0% confidence
Part of this parcel is mapped in a FEMA Special Flood Hazard Area (zone AE); flood insurance and elevation requirements likely apply — confirm with the city and a surveyor.
The details
Builder view: FEMA zone AE (SFHA) per current NFHL data; floodplain ordinance and base flood elevation requirements apply — elevation certificate and local floodplain review required.
- Zone boundary is map-scale; a surveyed elevation governs.
90% confidence · source: FEMA NFHL flood hazard zones (MN DNR GDRS mirror) · as of 7/21/2026
Wetland indicators
✓ ClearNo mapped wetland/public-water indicators on this parcel in the current screening datasets; small or unmapped wetlands can still exist — a wetland delineation is recommended before design or purchase decisions.
The details
Builder view: No NWI/PWI overlap in current screening data; datasets under-map small basins — a wetland delineation is recommended before design or purchase decisions where soils/vegetation suggest hydrology. The local ordinance requires a vegetated buffer of 20–40 ft depending on the wetland's classification, plus a structure setback from the buffer (creeks (Elm/Rush/N. Fork Rush/Diamond) 25–50 ft; the district building setback is added on top of the buffer (§36-752(3)); watershed-district variation permitted (§36-752(6))) — a delineation and classification set the exact figure.
- Screening-level mapping only; absence in the dataset is not a delineation.
90% confidence · rule tier: local (city/township) ordinance data · source: Updated MN National Wetlands Inventory; DNR Public Waters Inventory basins · as of 7/21/2026
Sanitary sewer
i Info ModeledPublic utilities may be available nearby; connection location & fees require confirmation
Uses a regional screening default — the local ordinance is not yet loaded. Verify locally.
The details
Builder view: sanitary sewer: inside the regional wastewater service area (MUSA) — membership is a planning designation, NOT a connection at the boundary; timing unknown, confirm staging with the city.
- Sewer service state: Inside planned regional wastewater service area — not a sewer connection
- Service-area membership is modeled from regional GIS, not utility records.
- Without a municipal sewer connection, an on-site septic system (SSTS) is required, including a primary and alternate drainfield site (regional/state screening default (unverified) — not the local ordinance; verify with the jurisdiction).
55% confidence · rule tier: regional screening default (unverified)
Water service: not yet evaluated — unknown is not the same as no concern. water service not documented
The details
Builder view: Water service: no qualifying evidence in the current dataset (water service not documented); treat as unresolved, not as clear.
No underlying measurement on file for this signal.
- Unknown ≠ clear: absence of data is never treated as "no concern".
0% confidence
This parcel is in the Osseo Public School District school district per current boundary data.
The details
Builder view: School district: Osseo Public School District (MDE boundary data; boundaries can change — verify for enrollment decisions).
90% confidence · source: MDE school district boundaries · as of 7/21/2026
Setback & frontage envelope
i InfoWhich street this lot fronts is not yet resolved, so the buildable envelope is a range: roughly 4,773–5,401 sq ft depending on which street frontage governs — preliminary, not an approval or survey. Based on Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07); confirm your parcel's zoning.
The details
Builder view: Front-street assignment unresolved among two plausible frontages; setbacks applied per edge under each: ≈ 4,773–5,401 sq ft (front 25 ft, side 5 ft, rear 30 ft, corner side 15 ft); coverage cap narrows the upper bound to ≈ 5,401 sq ft; preliminary planar computation — not an approval or survey. Based on Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07); confirm your parcel's zoning.
- Preliminary — not an approval or survey.
- Which street this corner lot fronts could not be determined from the address; the range reflects both plausible frontage assignments, each with its own front/corner-side setbacks.
- Confidence is limited by: the zoning district is assumed (the city’s typical single-family district), not verified for this parcel.
- This district also caps the two side yards at a combined 15 ft total, with at least 5 ft on any one side (§36-295(3)b.1). The figure above applies only the 5 ft per-side minimum and does NOT account for that combined total, because this parcel does not present exactly two side yards — the buildable area shown may be larger than the ordinance allows. Verify the side-yard requirement with the city.
55% confidence · rule tier: local (city/township) ordinance data · source: Maple Grove single-family residential (R-2, typical) — Maple Grove City Code §36-295 (code current at retrieval, 2026-07) — read on a third-party mirror, not the publisher's own platform · as of 8/1/2026
Shoreland status
? UnknownThis lot is near a mapped public water, but its shoreland classification is not available in the current dataset — shoreland setbacks remain unresolved (never guessed); confirm with the DNR and the city.
The details
Builder view: Within statutory shoreland distance of a public water with no available DNR management class; OHWL/bluff/impervious standards unresolved — confirm the classification before design.
- Unknown ≠ clear: absence of data is never treated as "no concern".
- Within the MN statutory shoreland distance of a mapped public water whose DNR shoreland classification is not available in the current dataset — shoreland standards remain unresolved, never guessed.
50% confidence · source: DNR Public Waters Inventory basins · as of 7/25/2026
Trees & canopy
i Info ModeledThis lot reads as wooded — about 82.4% of it sits under tree canopy (2015 modeled estimate). Expect real trees, and real tree-clearing decisions.
The details
Builder view: Tree canopy ≈ 82.4% of parcel area (Wooded; bands: wooded ≥ 50%, partially wooded 20–50%). Source: 2015 UMN 1-m urban tree canopy (deciduous + coniferous classes); verify current conditions on site — clearing, storms and growth since 2015 are not reflected.
- Modeled from the 2015 UMN 1-m urban tree canopy raster; canopy may have changed since 2015. Screening only, not a survey.
- Modeled from the 2015 UMN 1-m urban tree canopy raster (deciduous + coniferous classes); canopy may have changed since 2015. Screening only, not a survey.
60% confidence · source: UMN 2015 TCMA Urban Tree Canopy (1 m, RSGAL/DRUM) · as of 7/25/2026
Build on this lot
A builder can turn the verify list above into answers — ask about this lot with no obligation.
Build in Maple Grove
These builders list Maple Grove in their service area (HomeBuildersMN directory, as of 2026-07-25).
Site signals
The raw per-field record behind the interpretation above — the same rights-filtered fields, each with its own source and last-verified date.
School districti Info Verified
Osseo Public School District
Source & last verified
Source: MDE school district boundaries. Last verified: 7/21/2026.
Flood zone! Concern Verified
Zone AE (FEMA special flood hazard area) Preliminary site signal — not a determination.
Source & last verified
Source: FEMA NFHL flood hazard zones (MN DNR GDRS mirror). Last verified: 7/21/2026.
Wetland presence✓ Clear Verified
No NWI is a planning tool; preliminary, not a delineation.
Source & last verified
Source: Updated MN National Wetlands Inventory. Last verified: 7/21/2026.
DNR public waters✓ Clear Verified
No
Source & last verified
Source: DNR Public Waters Inventory basins. Last verified: 7/21/2026.
Zoning districti Info Verified
R-A
Source & last verified
Source: Maple Grove Neighborhood Parcels — ZONING (city AGOL). Last verified: 8/12/2026.
DNR shoreland classification? Unknown Verified
Unknown — verify Within the MN statutory shoreland distance of a mapped public water whose DNR shoreland classification is not available in the current dataset — shoreland standards remain unresolved, never guessed.
Source & last verified
Source: DNR Public Waters Inventory basins. Last verified: 7/25/2026.
Tree canopy coverage (%)i Info Modeled
82.4% Modeled from the 2015 UMN 1-m urban tree canopy raster (deciduous + coniferous classes); canopy may have changed since 2015. Screening only, not a survey.
Source & last verified
Source: UMN 2015 TCMA Urban Tree Canopy (1 m, RSGAL/DRUM). Last verified: 7/25/2026.
Site sewer Service Classi Info Verified
Staged Future Inside a Met Council MUSA staging/reserve area (code 20) (MUSA comprehensive-plan vintage: 2040) — planned for future service, not currently served.
Source & last verified
Source: Met Council MUSA composite. Last verified: 8/4/2026.
Utilities
Seweri Info Modeled
Inside planned regional wastewater service area — not a sewer connection
Nearby sites in Maple Grove
Other potential building sites near this one — straight-line distance between parcel centres. Same preliminary signals, same caveats.