Search buildersGet Matched Free

Beta Potential building sites, not active for-sale listings. Verify ownership & availability before acting on anything here.

Aerial view of parcel 053-0211822310003, Plymouth with the parcel boundary outlinedAerial: Metropolitan Council / MnGeo (flown April 2025) · boundary: county GIS

Lot, Plymouth

Parcel PIN 053-0211822310003 · Hennepin County · 00000

Ask about this lot

Potential build site — identified from county GIS · as of 7/21/2026

County assessed value: land $122,500 · total $122,500 (county record as of Jul 2026)

Assessed value: Hennepin County record in the MetroGIS Regional Parcel Dataset, released Jul 20, 2026. County values are set for property tax, trail the market and phase in on newly platted lots (Minn. Stat. § 273.11, subd. 14a). Not an asking price.

Privately owned

Lot size
0.1 acres
Buildable envelope
Little or no buildable areaat a conservative estimate that understates — details below
School district
Osseo Public Schools (ISD 279)The boundary sets the resident district, not eligibility: under open enrollment a student may apply to a school in another district (Minn. Stat. § 124D.03).
Land type
Vacant land — lakeshore
  • Shoreland — General Development class water
  • FEMA flood zone A
  • Wetland indicators mapped
  • In the regional wastewater service area (MUSA)
  • Zoned RSF-1 (mapped)
  • Wooded — ~100% tree canopy (2015 modeled)

Setting

Neighbourhood
Established: 4 of 4 neighbouring parcels built, most neighbours built 1900–1981
Nearest highway
0.9 mi
Nearest rail line
0.5 mi
Slope
Gentle: 6% on average across the lot
Tree canopy
100% of the lot in 2015

Computed from county parcel and map data, as of October 2026. Screening only, not a survey. Sources: Met Council road centerlines (2026-10-08), Generalized Land Use 2025 and active railroads; the regional parcel dataset (2026-07-20); NWI wetlands and DNR public waters; the UMN 2015 1-m tree canopy. Elevation: the MN DNR LiDAR 1 m bare-earth elevation model (metro collection, validated October 2012), data contributed by the Minnesota Department of Natural Resources. Walkout and lookout potential are a builder rule of thumb, not a survey.

All site signals below are preliminary site signals — not a determination. Verify before you rely on them.

Data confidence

A plain-language status — not a score. This page documents 5 facts from public records (one of them the 6 building rules cited to Plymouth City Code §21355.13), estimates 2 more from models, relies on 2 unverified screening defaults, and lists 8 things to verify before you rely on it.

What we know
5 documented signals (building rules (cited), parcel boundary, jurisdiction, mapped zoning and 1 more) — each carries its source and as-of date below.
What we estimate
2 modeled values (preliminary setback envelope, sewer proximity (estimated)) — modeled, not measured; treat as screening only.
What needs verification
8 items only a professional or the city can confirm — the full checklist is below.
Rules basis
Plymouth RSF-1 Single Family Detached Dwelling District 1 — Plymouth City Code §21355.13 (Municode, api.municode.com client 15587 product 15701 job 499079; code currency Ord. No. 2026-05 enacted 2026-04-28, Supp. No. 8 Update 3; section history Ord. No. 2019-01, 2019-02-12; retrieved 2026-10-01) + regional screening defaults for rules not yet loaded — This parcel is mapped as zoning district RSF-1 in the city’s published GIS layer. Some rules shown use a regional screening default — the Plymouth ordinance is not yet loaded for them; verify locally before relying on any number. This parcel appears smaller than Plymouth's 18,500 sq ft minimum for its mapped RSF-1 district (§21355.13); lots of record platted before the standard took effect may still be buildable - confirm with the city.

Plain-English summary

This parcel in Plymouth sits in the Osseo Public Schools (ISD 279) school district. Part of the parcel is mapped in a FEMA Special Flood Hazard Area, so flood insurance and elevation requirements likely apply. Wetland indicators overlap the parcel in screening data — a field delineation is the next step, since mapped lines are not legal boundaries. On utilities, water service is undocumented and sewer service is inside the regional service area — a connection is not confirmed until the city or utility confirms it, so budget time to verify location and fees. Tree cover is substantial — most of the lot sits under canopy in the 2015 modeled estimate, so plan for clearing and tree-preservation choices. We do not yet have data on terrain and water service — on this page, unknown never means "no concern."

Rules applied: Plymouth RSF-1 Single Family Detached Dwelling District 1 — Plymouth City Code §21355.13 (Municode, api.municode.com client 15587 product 15701 job 499079; code currency Ord. No. 2026-05 enacted 2026-04-28, Supp. No. 8 Update 3; section history Ord. No. 2019-01, 2019-02-12; retrieved 2026-10-01) + regional screening defaults for rules not yet loaded This parcel is mapped as zoning district RSF-1 in the city’s published GIS layer. Some rules shown use a regional screening default — the Plymouth ordinance is not yet loaded for them; verify locally before relying on any number. This parcel appears smaller than Plymouth's 18,500 sq ft minimum for its mapped RSF-1 district (§21355.13); lots of record platted before the standard took effect may still be buildable - confirm with the city.

What we know, what we estimate, what you must verify

What we know

Recorded, authoritative facts.

  • Building rules (cited)6 rule sets cited to Plymouth City Code §21355.13

    Source: Plymouth RSF-1 Single Family Detached Dwelling District 1 — Plymouth City Code §21355.13 (Municode, api.municode.com client 15587 product 15701 job 499079; code currency Ord. No. 2026-05 enacted 2026-04-28, Supp. No. 8 Update 3; section history Ord. No. 2019-01, 2019-02-12; retrieved 2026-10-01) · as of 10/1/2026 · 90% confidence

  • Parcel boundaryRecorded county GIS parcel on file (not a survey)

    Source: County GIS

  • JurisdictionPlymouth, Hennepin County

    Source: County GIS

  • Mapped zoningRSF-1

    Source: Plymouth Zoning Map (city portal, ZoningMap service layer 3) · as of 10/2/2026

  • Market statusPotential build site — identified from county GIS

    Source: MetroGIS Regional Parcel Dataset (MN Geospatial Commons) · as of 7/21/2026

What we estimate

Modeled or preliminary — useful for screening, not decisions.

  • Preliminary setback envelopeAt a conservative estimate, required setbacks leave little or no buildable area on this lot. Because this estimate understates, the true buildable area may still be workable — verify with the city before ruling the lot out. Based on Plymouth RSF-1 Single Family Detached Dwelling District 1 — Plymouth City Code §21355.13 (Municode, api.municode.com client 15587 product 15701 job 499079; code currency Ord. No. 2026-05 enacted 2026-04-28, Supp. No. 8 Update 3; section history Ord. No. 2019-01, 2019-02-12; retrieved 2026-10-01); confirm your parcel's zoning. Conditional setback unresolved: front/corner side become 50 ft where the lot abuts an arterial street (§21355.13 note (b)) — this parcel's abutting street could not be classified, so the base value is shown. Governing setback is the shoreland OHWL standard (75 ft, §21665.04 Subd. 2) — Plymouth shoreland management overlay — Plymouth City Code §21665 (Municode Supp. 8 Upd. 2, updated 2026-06-26); measured from the mapped water edge (DNR Public Waters Inventory) — an approximation, not the surveyed ordinary high water line.

    Source: Plymouth RSF-1 Single Family Detached Dwelling District 1 — Plymouth City Code §21355.13 (Municode, api.municode.com client 15587 product 15701 job 499079; code currency Ord. No. 2026-05 enacted 2026-04-28, Supp. No. 8 Update 3; section history Ord. No. 2019-01, 2019-02-12; retrieved 2026-10-01) · as of 10/1/2026 · 40% confidence

  • Sewer proximity (estimated)Public utilities may be available nearby; connection location & fees require confirmation

    55% confidence

What you must verify

Professional and municipal confirmations before you build.

  • Boundary survey (a recorded GIS boundary is not a survey)
  • Wetland delineation by a certified delineator
  • Soil borings & septic feasibility (if no municipal sewer)
  • Utility connection points, capacity and SAC/WAC fees with the city or utility
  • Permit eligibility and any overlay/PUD conditions with the jurisdiction
  • Easements, covenants and title work
  • Final setbacks and buildable area per the current local ordinance
  • Actual construction cost from builder quotes

What each signal means

Written for homeowners; open “the details” on any card for the builder view and the raw measurement behind it.

Slope & terrain

Unknown

Slope & terrain: not yet evaluated — unknown is not the same as no concern. no slope statistics

The details

Builder view: Slope & terrain: no qualifying evidence in the current dataset (no slope statistics); treat as unresolved, not as clear.

No underlying measurement on file for this signal.

  • Unknown ≠ clear: absence of data is never treated as "no concern".

0% confidence

Flood mapping

Concern

Part of this parcel is mapped in a FEMA Special Flood Hazard Area (zone A); flood insurance and elevation requirements likely apply — confirm with the city and a surveyor.

The details

Builder view: FEMA zone A (SFHA) per current NFHL data; floodplain ordinance and base flood elevation requirements apply — elevation certificate and local floodplain review required.

  • FEMA flood zone: Zone A (FEMA special flood hazard area, no base flood elevation determined)

    Source: FEMA NFHL flood hazard zones (MN DNR GDRS mirror) · as of 7/21/2026 · 90% confidence

  • Zone boundary is map-scale; a surveyed elevation governs.

90% confidence · source: FEMA NFHL flood hazard zones (MN DNR GDRS mirror) · as of 7/21/2026

Wetland indicators

Concern

Mapped wetland/public-water indicators overlap this parcel. This is a screening result, not a confirmed legal boundary — a wetland delineation is recommended before design or purchase decisions.

The details

Builder view: NWI/PWI overlap present — a SCREENING constraint, not a delineated boundary; a wetland delineation is recommended before design or purchase decisions. The local ordinance requires a vegetated buffer of 20–67 ft depending on the wetland's classification, plus a structure setback from the buffer (Plymouth requires a vegetated buffer of 20 to 67 feet depending on the wetland’s quality classification, plus a 15-foot structure setback from the buffer edge — roughly 35 to 82 feet from the wetland itself (Plymouth City Code §21670.05). A delineation and MnRAM classification set the exact figure, and Plymouth’s code states these setbacks take precedence over the district’s ordinary setbacks.) — a delineation and classification set the exact figure. WCA/LGU review applies if impacts are proposed.

  • Wetland mapped (NWI): Yes

    Source: Updated MN National Wetlands Inventory · as of 7/21/2026 · 90% confidence

  • DNR public waters: No

    Source: DNR Public Waters Inventory basins · as of 7/21/2026 · 90% confidence

  • Screening-level mapping only; field conditions govern.

90% confidence · rule tier: local (city/township) ordinance data · source: Updated MN National Wetlands Inventory; DNR Public Waters Inventory basins · as of 7/21/2026

Sanitary sewer

Info Modeled

Public utilities may be available nearby; connection location & fees require confirmation

Uses a regional screening default — the local ordinance is not yet loaded. Verify locally.

The details

Builder view: sanitary sewer: inside the regional wastewater service area (MUSA) — membership is a planning designation, NOT a connection at the boundary; timing unknown, confirm staging with the city.

  • Sewer service state: Inside planned regional wastewater service area — not a sewer connection
  • Service-area membership is modeled from regional GIS, not utility records.
  • Without a municipal sewer connection, an on-site septic system (SSTS) is required, including a primary and alternate drainfield site (regional/state screening default (unverified) — not the local ordinance; verify with the jurisdiction).

55% confidence · rule tier: regional screening default (unverified)

Water service

Unknown

Water service: not yet evaluated — unknown is not the same as no concern. water service not documented

The details

Builder view: Water service: no qualifying evidence in the current dataset (water service not documented); treat as unresolved, not as clear.

No underlying measurement on file for this signal.

  • Unknown ≠ clear: absence of data is never treated as "no concern".

0% confidence

School district

Info

This parcel is in the Osseo Public Schools (ISD 279) school district per current boundary data.

The details

Builder view: School district: Osseo Public Schools (ISD 279) — MDE boundary data; boundaries can change, so verify for enrollment decisions.

  • School district: Osseo Public Schools (ISD 279)

    Source: MDE School District Boundaries, SY2025-26 · as of 10/6/2026 · 90% confidence

90% confidence · source: MDE School District Boundaries, SY2025-26 · as of 10/6/2026

Setback & frontage envelope

Info

At a conservative estimate, required setbacks leave little or no buildable area on this lot. Because this estimate understates, the true buildable area may still be workable — verify with the city before ruling the lot out. Based on Plymouth RSF-1 Single Family Detached Dwelling District 1 — Plymouth City Code §21355.13 (Municode, api.municode.com client 15587 product 15701 job 499079; code currency Ord. No. 2026-05 enacted 2026-04-28, Supp. No. 8 Update 3; section history Ord. No. 2019-01, 2019-02-12; retrieved 2026-10-01); confirm your parcel's zoning. Conditional setback unresolved: front/corner side become 50 ft where the lot abuts an arterial street (§21355.13 note (b)) — this parcel's abutting street could not be classified, so the base value is shown. Governing setback is the shoreland OHWL standard (75 ft, §21665.04 Subd. 2) — Plymouth shoreland management overlay — Plymouth City Code §21665 (Municode Supp. 8 Upd. 2, updated 2026-06-26); measured from the mapped water edge (DNR Public Waters Inventory) — an approximation, not the surveyed ordinary high water line.

The details

Builder view: Conservative uniform buffer (75 ft) consumes the parcel; the asymmetric envelope may still be viable — edge classification and a survey govern. Based on Plymouth RSF-1 Single Family Detached Dwelling District 1 — Plymouth City Code §21355.13 (Municode, api.municode.com client 15587 product 15701 job 499079; code currency Ord. No. 2026-05 enacted 2026-04-28, Supp. No. 8 Update 3; section history Ord. No. 2019-01, 2019-02-12; retrieved 2026-10-01); confirm your parcel's zoning. Conditional setback unresolved: front/corner side become 50 ft where the lot abuts an arterial street (§21355.13 note (b)) — this parcel's abutting street could not be classified, so the base value is shown. Governing setback is the shoreland OHWL standard (75 ft, §21665.04 Subd. 2) — Plymouth shoreland management overlay — Plymouth City Code §21665 (Municode Supp. 8 Upd. 2, updated 2026-06-26); measured from the mapped water edge (DNR Public Waters Inventory) — an approximation, not the surveyed ordinary high water line.

  • Zoning district: RSF-1

    Source: Plymouth Zoning Map (city portal, ZoningMap service layer 3) · as of 10/2/2026

  • Conservative approximation only — this result understates the true buildable area.

40% confidence · rule tier: local (city/township) ordinance data · source: Plymouth RSF-1 Single Family Detached Dwelling District 1 — Plymouth City Code §21355.13 (Municode, api.municode.com client 15587 product 15701 job 499079; code currency Ord. No. 2026-05 enacted 2026-04-28, Supp. No. 8 Update 3; section history Ord. No. 2019-01, 2019-02-12; retrieved 2026-10-01) · as of 10/1/2026

Shoreland status

Info

This lot is in a mapped shoreland zone of a General Development-class water: structures must be set back 50 ft (sewered) / 75 ft (unsewered) from the ordinary high water line (§21665.04 Subd. 2). The OHWL location comes from a survey, not a map.

The details

Builder view: Shoreland zone — DNR class General Development. structures must be set back 50 ft (sewered) / 75 ft (unsewered) from the ordinary high water line (§21665.04 Subd. 2). Bluff and shoreland-impervious standards may also apply; OHWL per survey.

  • DNR shoreland classification: Shoreland — General Development class water

    Source: DNR Public Waters Inventory basins · as of 7/25/2026 · 90% confidence

  • Part of this parcel is within 1000 ft of the OHWL of Bass (DNR PWI). Zone membership derived spatially at the MN statutory shoreland distances; the mapped OHWL is not a survey.

90% confidence · rule tier: local (city/township) ordinance data · source: DNR Public Waters Inventory basins · as of 7/25/2026

Trees & canopy

Info Modeled

This lot reads as wooded — about 100% of it sits under tree canopy (2015 modeled estimate). Expect real trees, and real tree-clearing decisions.

The details

Builder view: Tree canopy ≈ 100% of parcel area (Wooded; bands: wooded ≥ 50%, partially wooded 20–50%). Source: 2015 UMN 1-m urban tree canopy (deciduous + coniferous classes); verify current conditions on site — clearing, storms and growth since 2015 are not reflected.

  • Tree canopy coverage (%): 100%

    Source: UMN 2015 TCMA Urban Tree Canopy (1 m, RSGAL/DRUM) · as of 7/25/2026 · 75% confidence

  • Modeled from the 2015 UMN 1-m urban tree canopy raster; canopy may have changed since 2015. Screening only, not a survey.
  • Modeled from the 2015 UMN 1-m urban tree canopy raster (deciduous + coniferous classes); canopy may have changed since 2015. Screening only, not a survey.

60% confidence · source: UMN 2015 TCMA Urban Tree Canopy (1 m, RSGAL/DRUM) · as of 7/25/2026

Build on this lot

A builder can turn the verify list above into answers — ask about this lot with no obligation.

Get a build evaluation from vetted Twin Cities builders. This is a request to find a builder — not a real-estate listing or offer of representation.

Build in Plymouth

These builders list Plymouth in their service area (HomeBuildersMN directory, as of 2026-07-25).

Site signals

The raw per-field record behind the interpretation above — the same rights-filtered fields, each with its own source and last-verified date.

School district Info Verified

Osseo Public Schools (ISD 279)

Source & last verified

Source: MDE School District Boundaries, SY2025-26. Last verified: 10/6/2026.

Flood zone Concern Verified

Zone A (FEMA special flood hazard area, no base flood elevation determined) Preliminary site signal — not a determination.

Source & last verified

Source: FEMA NFHL flood hazard zones (MN DNR GDRS mirror). Last verified: 7/21/2026.

Wetland presence Concern Verified

Yes NWI is a planning tool; preliminary, not a delineation.

Source & last verified

Source: Updated MN National Wetlands Inventory. Last verified: 7/21/2026.

DNR public waters Clear Verified

No

Source & last verified

Source: DNR Public Waters Inventory basins. Last verified: 7/21/2026.

Zoning district Info Verified

RSF-1

Source & last verified

Source: Plymouth Zoning Map (city portal, ZoningMap service layer 3). Last verified: 10/2/2026.

DNR shoreland classification Info Verified

Shoreland — General Development class water Part of this parcel is within 1000 ft of the OHWL of Bass (DNR PWI). Zone membership derived spatially at the MN statutory shoreland distances; the mapped OHWL is not a survey.

Source & last verified

Source: DNR Public Waters Inventory basins. Last verified: 7/25/2026.

Tree canopy coverage (%) Info Modeled

100% Modeled from the 2015 UMN 1-m urban tree canopy raster (deciduous + coniferous classes); canopy may have changed since 2015. Screening only, not a survey.

Source & last verified

Source: UMN 2015 TCMA Urban Tree Canopy (1 m, RSGAL/DRUM). Last verified: 7/25/2026.

Site sewer Service Class Info Verified

sewered Inside the Met Council Current Wastewater Service Areas footprint — currently served, not merely planned.

Source & last verified

Source: Met Council Current Wastewater Service Areas (LPH publication). Last verified: 8/4/2026.

Utilities

Sewer Info Modeled

Inside planned regional wastewater service area — not a sewer connection

Nearby sites in Plymouth

Other potential building sites near this one — straight-line distance between parcel centres. Same preliminary signals, same caveats.